On Sunday 03/20/22 Companies 14, 20, 12, and Tanker 172 were dispatched to a reported structure fire in the area of 191 Warm Hollow Road. Company 20 Engine 209, Utility 202, and Response 206 responded with a crew of 11 personnel. Companies 16 and 23 were also added to the assignment for a tanker, as well as manpower. Engine 209 arrived on the scene of a single story residential dwelling heavily involved. Engine 209 placed an inch and three quarter handline into service initiating suppression followed by three other attack lines. Crews worked on scene for approximately 15 minutes before the fire was brought under control. Crews remained on scene performing overhaul and confirming there was no further fire extension or hazards. At this time the cause of the fire is still unknown.